The first phase of the Greenhouse repairs are nearly complete with only cosmetic issues outstanding. Renovators Doug Wolffe and Matt Golas are now looking at restoring the greenhouse entrance facing the terrace, which is in desperate need of attention. The Henry board has agreed that the work should continue on that section. We expect the work to be completed by mid April.  The four Portico columns, which had lost structural integrity due to rot on the bases are being pulled and rebuilt. Two rebuilt columns have been set back in place with pins and the remaining two will be rebuilt and set back in place by the third week of March. The Mary Henry writing cabin exterior work is nearly complete, including structural repairs on the left front corner, new window glass and new steps and a railing system. The interior of the cabin will be restored as a living museum.